Trails Master Plan
North Salt Lake spent eight months with the consultant SE Group and its Trails and Active Transportation Committee drafting a master plan for the foothill trail system, where unofficial trails built at steep grades have caused erosion, rutting and conflicts among users. The draft recommends maintenance, new trail corridors in the Wild Rose and Woodbriar areas, and removing some of the user-created trails. It rests on a spring survey with 320 respondents, a summer survey with 79 and talks with Davis County, Bountiful, Salt Lake City and the Forest Service. Planning estimates in the packet include about 9.2 miles of new corridors for roughly $290,800 to build and $24,200 to design, and about $8,900 a year to maintain 7.4 miles. Staff stress that the plan guides budgeting and grant applications and does not commit the city to pay for anything. The committee recommended it on Oct. 13 with two changes: add the existing Woodbriar ravine trail to the maps as a trail to decommission, and require geotechnical analysis before building trails. The council saw the draft in an Oct. 20 work session with no action; the Planning Commission reviews it Oct. 27 and adoption is scheduled for the Nov. 4 council meeting. A trail marked for decommissioning in the draft is a proposal, not a closure.
- Where it stands
- In review
- Type
- Public project
- Status evidence date
- Tue, Oct 20
- Location
- Citywide
Updates
October 20, 2026
Work session presentation by SE Group; the staff memo recommended no action. Adoption is scheduled for Nov. 4. Source
October 13, 2026
The Trails and Active Transportation Committee recommended the plan with two changes (the ravine trail and geotechnical language). Source
Follow the money and project delivery
Trails Master Plan
- Council action
In review according to the dated project source. Record → · Oct. 20, 2026
- Money in the record
No itemized amount linked in the records collected.
- Signed agreement and payments
Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.
- Work and operating costs
Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →
Every hearing and vote
October 20, 2026 · City Council
Draft Trails Master Plan (work session)
Discussed
SE Group's draft plan was reviewed with no action requested. It covers maintenance, new corridors and decommissioning user-created trails. Estimates: about 9.2 miles of new corridors for about $290,822 construction and $24,235 design; $8,880 a year to maintain 7.4 miles; and a small Woodbriar trailhead at $125,000-$250,000. The Trails Committee recommended approval Oct. 13 with two changes; the Planning Commission reviews it Oct. 27 and council adoption is scheduled Nov. 4.
- Planning-level estimates; the plan's mileage figures are not fully consistent